DEMOLITION OF SHIP LOADER NO. 2
CLIENT
GrainCorp Ltd
LOCATION
Carrington, NSW
INDUSTRY
Agriculture
DURATION
Oct 17 – Nov 17
SERVICE
Marine Demolition and Deconstruction
PROJECT OVERVIEW
Major Projects Group was selected by GrainCorp Ltd to demolish the no.2 ship loader at Carrington Wharf in New South Wales.
SCOPE OF WORK
The project included the demolition and removal of the approximately 258 tonnes rail mounted ship loader no. 2 at GrainCorp’s Carrington Wharf site, as well as the removal of a 48 tonne boom with loading spout and nozzle. The final step of the project was to recycle all scrap generated from the works.
UNIQUE CHALLENGES

Potential for objects falling into the water
Lead paint used on the entire structure
Proximity to live wharf infrastructure
CUSTOMIZED SOLUTIONS
Major Projects Group removed the boom using a 250 tonne crane and dismantled the remaining structure using a 130 tonne crane and a 50 tonne crane. In order to process the demolished structural components, Major Projects Group used a 32 tonne excavator equipped with specialist demolition attachments.
RESULTS
The project was completed ahead of time, according to plan and within the allocated budget.