EAST PERTH/FREMANTLE POWER STATION

PROJECT PROFILE

CLIENT

Western Power Corporation

LOCATION

Perth, WA

INDUSTRY

Power

DURATION

6 Months

SERVICE

Industrial Demolition and Deconstruction 

PROJECT OVERVIEW

Major Projects Group undertook the partial demolition of the East Perth/Fremantle Power Station for the Western Power Corporation.The scope included to clean and remove unsafe sections of heritage structures at the East Perth Power Station Site.

Picture 1 – Salvage of Industrial Assets

Salvage operation undertaken prior to total demolition. Here the internal turbine area can be seen.

Picture 2 – Main Structure Demolition

Main structure down and being processed. Steelwork downsized with a LaBounty 220 hydraulic shield.